Roadway Improvements

Status of Current Roadway Projects

Wildlife Parkway

Belt Line Road to State Highway 161

Construction of a new four lane divided concrete roadway which will contain two bridges; sidewalks, storm drain and traffic signal improvements.

Expected to End: Early Fall 2025

Tarrant Road at Arbor Creek

West Tarrant Road at Arbor Creek Paving, Drainage, Water and Wastewater Improvements

The purpose of the West Tarrant Road at the Arbor Creek project is to elevate the roadway at Arbor Creek and replace the inadequate capacity box culverts with a 150-foot-long bridge to provide capacity to safely convey the 100-year flood event. The project involves removal of the existing box culvert crossing, pavement and sidewalk, wastewater main relocations, water line relocations, storm drain improvements, embankment and retaining wall construction, new bridge construction and paving and sidewalk improvements.

Expected End Date: June 2026

 

Traffic Signal - Arlington Webb Briton Road at England Parkway

New traffic signals, sidewalk, ADA ramps and pavement markings.

Expected End Date: January 2026

Traffic SIgnal - Bardin Road at Sgt. Greg Hunter Lane

New traffic signal, fiber optics, sidewalk, ADA ramps, pavement for a new left-turn lane and pavement markings.

Expected End Date: January 2026

 

Trinity River Authority Point of Entry (POE) Wastewater Line

Duncan Perry Road North of Kingsley

Relocation of a wastewater line which is in anticipation of the Texas Department of Transportation (TxDOT) project for the reconstruction of the bridge over Johnson Creek for Duncan Perry Road which is a separate project that is expected to begin in the spring of 2026. Traffic along Duncan Perry Road may be impacted during the wastewater line construction. 

Expected End Date: September 2025

Dynamic Message Signs and CCTV at SH 180 and Interstate 30

Along Interstate 30 from SH 161 to Macarthur Blvd and SH 180 from NW 23rd St to Jonathan Dr

Project includes Furnishing and installing Dynamic Messaging Signs (DMS) and Closed-Circuit Television (CCTV) Cameras along IH 30 and SH 180. This allows for visual monitoring of traffic flow and incidents along the corridors which will allow staff to make signal timing changes, as needed, and the ability to post messages on the DMS to inform motorists of incidents ahead and direct them to detour routes, if necessary. 

Expected Start Date: July 2025

Expected End Date: June 2026

 

Avenue K - Right Turn Lane

E. Avenue K at SH 360

Construction of designated westbound right-turn lane at Avenue K and SH 360. Project will also include roadway drainage modifications, signal modification and utility relocation.

Expected Start Date: October 2025

Expected End Date: February 2026

 

Jefferson Street - State Highway 161 to Cimmaron Trace

State Highway 161 to Cimmaron Trace to include the intersection of Jefferson and Carrier Parkway

Reconstruction of the existing asphalt to a concrete roadway. Construction will include paving, street lighting, storm drainage, sidewalks, and traffic signals. 

Expected Start Date: Fall 2025

Expected End Date: Late 2026

 

Main Street and East Jefferson Street Roundabout

Construction of a roundabout at the intersection of E. Main Street/Jefferson Street. This project improves the intersection operations while routing westbound truck traffic from Main Street to Jefferson Street.

Expected Start Date: Late 2025

Expected End Date: Early 20227

 

1/4 Cent Sales Tax Street Projects

Grand Prairie residents voted to increase the city's sales tax by one quarter of one cent to repair existing streets and alleys throughout the city.

The Street Maintenance Sales Tax fund provides the resources for the maintenance and replacement of existing city streets and alleys.

2025 Sales Tax Street Projects

Street Name From/To Status

Canadian Cir

Camelot to King Arthur

In Progress

108th St

Avenue J to City Limits In Progress
Martin Luther King
W E Roberts to Texas St Summer 2025
NW 9TH ST Turner Blvd to Blackburn St Spring 2025
Oak St Beltline Rd to NE 15TH St Summer 2025
Maple St Cottonwood St to NE 19th St Summer 2025
Elm Dr Wildflower Dr to SE 8TH St Completed
Monterrey Park Subdivision S Beltline Rd to Acosta St Summer 2025
Greenhill Ln W Crossland Blvd to Pinoak Dr In-Progress
Prairie Creek Dr Robinson Rd to S Carrier Pkwy Spring 2025
Sequoia Dr Iris Dr to Dahlia Dr Completed
Clark Trl Kite to Aberdean Trl Spring 2025
W Polo rd Mathew Rd to Lakeridge Summer 2025
Westchester Subdivision East of S Carrier to South of I -20 Summer 2025
2029 Wilderness Trl Alley Red River Trail to Alley Tee/1913 Wilderness Completed
Margaret Alley SW 5TH to SW 6TH St Summer 2025
1809 Westminster Dr Alley Yorkshire to Sharpshire Spring 2025