West Tarrant Road at Arbor Creek Paving, Drainage, Water and Wastewater Improvements
The purpose of the West Tarrant Road at the Arbor Creek project is to elevate the roadway at Arbor Creek and replace the inadequate capacity box culverts with a 150-foot-long bridge to provide capacity to safely convey the 100-year flood event. The project involves removal of the existing box culvert crossing, pavement and sidewalk, wastewater main relocations, water line relocations, storm drain improvements, embankment and retaining wall construction, new bridge construction and paving and sidewalk improvements.
Expected End Date: June 2026