The Owner/Operator is responsible for the preparation of the Stormwater Pollution Prevention Plan (SWP3) prior to any site work. A full executed SWP3 shall be submitted electronically to the Stormwater Department for review and acceptance. The SWP3 shall be prepared in accordance with the TPDES Construction General Permit(PDF, 66KB) and the City of Grand Prairie Ordinances.
All erosion controls shall be installed in accordance with the Stormwater Pollution Prevention Plan (SWP3) and Erosion Control Plans. Prior to any earth disturbing activities commencing on, the Stormwater Department or designee shall inspect Best Management Practices (BMPs).